Excel is by far the most used application for data analysis, and mastering it is a must-have skill in many companies. It can also be a huge time-saver: an Excel master can be tens or hundreds of times more productive than a beginner. And add-ins can play a significant role in improving your efficiency with Excel, bring you the tools you need to perform well.



What is an Excel add-in?


Excel add-ins are small programs that can be installed to enhance the capabilities of Microsoft Excel by adding new custom features.


There are hundreds of Microsoft 365 Excel add-ins on the market, covering a wide range of functions.


In this post, we list and describe over 75 add-ins, plugins and apps that complement Microsoft Excel with additional features and options to be even more productive and impress with your abilities with Excel. Some of them are free and some are not, but each of them perform tasks that can greatly help you becoming an Excel rock star.



What are the best Excel add-ins?


Here are 75 of the best add-ins for Microsoft 365 Excel (free or not):

  1. Power-user

  2. Tableau desktop

  3. F9

  4. SQL Spreads

  5. Kutools

  6. Advanced Formula Environment

  7. PowerPivot

  8. XLGL

  9. ASAP Utilities

  10. MonteCarlito

  11. Intis Telecom

  12. Analystix Tools

  13. People Graph

  14. Analysis ToolPack

  15. Solver

  16. Power Query

  17. StatPlus:mac

  18. FRED

  19. Simtools

  20. Formlist

  21. NXPowerLite Desktop 8

  22. Jensen

  23. Anomaly Server

  24. XLSTAT

  25. Operis Analysis Toolkit (OAK)

  26. Table Analysis Tools and Data Mining Client

  27. Dose

  28. Supply Chain add-in

  29. Office Tabs

  30. ParallelDots

  31. vIcons

  32. Random Number Generator

  33. Random Sorter

  34. Audit Tickmark Toolbar

  35. QR4Office

  36. Geographic Heat Map

  37. Formula Foundry

  38. Ultimate Suite

  39. Lucidchart

  40. Supermetrics

  41. GIGRAPH Network Visualization

  42. Selection Diff Tool

  43. XY Chart Labeler

  44. Hoadley Finance

  45. ModernCharts

  46. Microsoft Dynamics

  47. Risk Analyzer

  48. Panel Chart

  49. BulkQuotesXL Pro

  50. Vertex42 Templates Gallery

  51. Model Analyzer

  52. Weather by Visual Crossing

  53. Spreadsheet123

  54. Capital Budgeting

  55. Inventory

  56. Bubbles

  57. Excellent Analytics

  58. SEOTools

  59. SEOGadget

  60. Checkbook Assistant

  61. Loan Assistant

  62. Flash Card Assistant

  63. ActiveData

  64. Mekko Chart Creator

  65. Conditional Row Delete

  66. Power Utility Pack

  67. Mini Calendar and Date Picker

  68. Favorite Bookmarks

  69. Functions Translator

  70. RDBmail

  71. Intrinio

  72. Excel training and tips

  73. Power Reconcile

  74. Microsoft Flow for Excel

  75. Accelerate Excel




Power-user is an add-in for Excel, PowerPoint and Word. It has dozens of impressive features designed for anyone who use the Office Suite on a frequent basis:

  • Ability to create dozens of new charts like Mekko, Dumbbell, Arrow charts, Sankey charts, jitter plots, etc.

  • Maps connected to Excel data for every country, continent or state,

  • Robust Excel-PowerPoint links,

  • Powerful new functions like SumColor, CountColor, CountVisible, IsFormula, IsMerged, LastCell, LastRowNumber, LastColumnNumber, SumFromAllSheets, VlookupMax, SlicerItems, CAGR, etc.

  • Copy and paste visible cells only,

  • UnPivot a crosstab table, changing it into a database,

  • Quickly format numbers, currencies and dates in Excel,

  • Tools to clean your data from merged cells, remove empty cells or simplify formulas

  • Swap the position of cells or charts,

  • Easily format your tables with horizontal or vertical borders,

  • ...and more! 




​But Power-user also brings amazing new features for PowerPoint and Word:

  • A rich library of 850 beautiful PowerPoint templates, 8,000 vector icons and flags, 10+ million high-quality pictures, an AI image generator, dashboard tools such as Gauges, traffic lights, Harvey balls, etc.

  • An automatic Agenda builder,

  • A cleaner to detected and fix inconsitencies

  • ... powerful formatting tools to align titles, harmonize fonts or colors, clean a presentation, edit multiple charts, align or move shapes, change languages, etc.! 



2. Tableau Desktop - $999 to $1,999


Tableau is a data visualization add-in. You have to start by connecting it to your data. It can come from an Excel spreadsheet, but also from one of the data sources provided with the add-on. Then you start creating reports or dashboards by using drag and drop on the Tableau work space. Tableau claims its software is one of the fastest on the market; a well-created Tableau report should allow to quickly filter or zoom on part of the data to answer a specific question. Tableau is available on both Windows and iOS.

Excel add-in - Tableau


3. F9 - On quotes only


F9 allows you to work on your accounting data, preparing and distributing financial reports to a group of contacts throughout your organization. Some of your data can be linked between Excel and your accounting system. F9 is available on working on PC only, for versions 2003 to 2019, but not on Mac iOS.


4. SQL Spreads – starting at $348/year


Using SQL Spreads, you can create user-friendly solutions that allow non-technical users to effortlessly Update, Insert, and Delete data in SQL Server, all through the familiar Microsoft Excel interface. SQL Spreads provides a secure solution, ensuring data quality with features like automatic data validation, foreign key lookups, change tracking and Designer vs Data Editor roles. You can try out SQL Spreads by downloading the free 14-day trial that can be found on their website.


SQL Spreads Ribbon - Excel add-in


5. Kutools - $39


Kutools provides a very large number of little tools and Excel functions that can turn out useful time-savers in several situations. The cons of this add-in is that is has a lot of features, but a large numbers of them you will probably never use. The pros is that several tools can be really useful, such as the possibility to paste data only to visible cells, to count cells by colors or to combine sheets. Kutools works with Excel 2007 to 2019 on PC.

Excel add-in - Kutools


This Excel add-in is provided by Microsoft itself. It offers a new, modernized environment for writing named formulas and Lambda functions. Compared to the usual formula bar, it allows syntax highlighting, inline errors, comments and formatting. It's also perfect for importing Lambda functions. The app works with Microsoft Excel 2013 and later on PC, Mac or the web.

Excel add-in - Advanced Formula Environment


7. PowerPivot - Free


PowerPivot is a Microsoft add-in designed to turn Excel into a business intelligence software. Basically, PowerPivot could be described as "Microsoft Access for dummies". You can build tables with relationships that will be much faster than the time-consuming classical VLOOKUP function in Excel. However our personal experience with PowerPivot is that it still lacks stability and it often causes Excel files to be corrupt... Since Excel 2013, PowerPivot is built-in and doesn't need to be downloaded. You can activate it like any add-in. For prior versions of Excel, you need to download it from the Microsoft website.



8. XLGL - $299


XLGL is an accounting and reporting tool that fetches data from accounting software Sage to update Excel spreadsheets. GL stands for the accounting term General Ledger. Using XLGL, you can use formulas to work with updated data on customer orders, employee hours, inventories, etc. It is also provided with report layouts. XLGL works on PC with Excel version 2007, 2010, 2013, 2016 and 2019.


9. ASAP Utilities - $49


ASAP Utilities is an Excel add-in focusing on saving time. Although many features are not rocket-science, some are interesting like the possibility to sort tabs alphabetically or by color, or the tool to insert cells before or after each cell in the selection. ASAP is one of the only add-ins available starting with Excel version 2000 and works with every version on PC up to Excel 2019.


10. MonteCarlito - Free


As the name suggests, MonteCarlito is designed to run Monte-Carlo simulations in Excel, as well as other statistical analysis to compute mean, median, standard error, variance, skewness, kurtosis, etc. It is quite an old and simple add-in, but MonteCarlito works with both Windows and Mac iOS versions of Excel.

Excel add-in - MonteCarlito


11. Intis Telecom - FREE


The Intis Telecom plugin allows you to send SMS directly from Excel. Select a range with phone numbers in your spreadsheet and the plugin will send them the SMS of your choice. The plugin is free but requires to purchase credits to send SMS. Intis Telecom is compatible with Excel 2003 to 2019 on PC. It is not available on Mac.



12. Analystix Tools - Free


Analystix provides a free Excel add-in meant for financial analysis. It includes tools to calculate CAGR, WACC (weighted average cost of capital), Black & Scholes formula, as well as an histogram builder to visualize distribution and a date arranger. Analystix Tools works on Excel 2010 and later on PC.


13. People Graph - Free


This plugin lets your create and update people graphs, a typical tool for infographics. This add-in works on PC with Excel 2013 to 2019, on Excel 2016 for Mac, Excel Online and Excel for iPad.

Excel add-in - People Graph


14. Analysis ToolPack - Free


The Analysis ToolPack is a Microsoft add-in that allows statistical analysis such as correlation analysis, descriptive statistics or histograms. It is provided on every computer using Excel 2007 and later, Mac or PC. You just need to load the add-in.


15. Solver - Free


The Solver is a tool that is also provided by Microsoft with Excel 2007 and later. It can be used for what-if analysis, to find optimal value for a formula in a cell under constraints limiting other formula cells. Basically, the Solver will determine the maximum or minimum value that a formula can take while changing several other cells.


16. Power Query - Free


This Microsoft add-in is made to help access and explore data in Excel like with Business Intelligence tools, by allowing to import, transform or combine multiple data sources. Power Query requires Excel 2010 or 2013 on Windows.

Excel add-in - Power Query


17. StatPlus:mac - €189


StatPlus:mac is one of the very few Excel add-ins for statistics that works on Mac. It is a statistical analysis package allowing to analyze correlations, run regressions, time series or data processing analysis, to create statistical charts, etc. StatPlus is actually available on both PC (2007 to 2019) and Mac (2004 to 2016).

Excel add-in - StatPlus:mac


18. FRED - Free


Provided by the Federal Reserve Bank of St Louis, this free add-in provides access to macroeconomic data from multiple sources such as the BEA, OECD, BLS or Census. Time series can be inserted into Excel with a few clicks, and you can then automatically calculate growth rate or change the data frequency. You can even refresh your spreadsheet with the most up to date data and see your entire dashboard adapt to it. The FRED add-in works with Excel 2010 and 2013.


19. Simtools - Free


Simtools adds 32 statistical functions to perform Monte Carlo simulations and risk analysis in Excel spreadsheets. Functions cover cumulative probability, correlations among random variables, decision analysis, analyzing discrete probability distributions, regression analysis, or random generation of discrete distributions. Simtools works on PC with Excel 2003 and later.


20. Formlist - Free


Formlist is an auditing tool that provides procedure for displaying the formulas of any selected range of cells in Excel. It is a very simple add-in with limited possibilities, but it's free, and it works on Excel 2003 and later for PC.



Not exclusively for Excel but working with PowerPoint, Excel, and Word, as well as JPEG or PDF files, NXPowerLite compresses files and optimize them for screen, print or mobile devices. It can also automatically compresses your email attachment files, a feature that you can also temporarily disable if you don't want it. NXPowerPointLite does not work on Mac iOS.

​​ 

22. Jensen - Free


Jensen has actually created multiple Excel add-ins performing various tasks, mainly for statistics analysis purposes. One is for Markov analysis, one for random variables, one for decision analysis, one for simulation, etc. These add-ins are quite old and were designed for Excel 2003 on Windows.


23. Anomaly Server - Free


This tool helps you identify anomalies and outliers in a data set. the US directly into Excel from data.gov. This Excel tool works with Excel 2016 and  up for PC and Mac, as well as with Excel Online.


24. XLSTAT - $235 to $940


XLSTAT works as an add-on with about 100 features for advanced statistical analysis: linear or non-linear regressions, k-means, principal component analysis, etc. XLSTAT is highly compatible, working on PC for version 97 up to 2019 and on Mac with Excel 2011 and 2016.

Excel add-in - XLstat



This Excel add-in aims at helping you understand complex spreadsheets and reduce the risk of errors. The main features are a workbook summary, a spreadsheet structure map, a formula walker and other solutions to compare, audit and search Excel workbooks. OAK is compatible with Excel on Windows, but not with Mac iOS. 

Excel add-in - Dashboard Tools for Excel



These 2 add-ins for Excel are provided by Microsoft for data mining. Table Analysis Tools for Excel leverages SQL Server 2012 data mining models from an Excel spreadsheet, while Data Mining Client lets you explore data mining models. These tools require Excel 2010 or 2013 on Windows.


27. Dose - €33.84


Dose is a great collection of tools for Excel. It contains many, many features such as a date picker, an auto back-up solution, powerful functions, tools to find duplicated, list files, manage rows, clean data, count words and more. The add-in is compatible with Excel 2007 to 2019 on PC. 

Excel add-in - Dose

28. Supply Chain add-in - Free but requires subscription


This Excel plugin helps you build powerful geographical visualizations. Not only can you create data-driven maps, but also geocoding, distance calculations, warehouse locations optimizations and more. It works with Excel 2016 and later on Windows, Mac and web.

Excel add-in - Supply Chain


29. Office Tabs - Free


The Office Tabs add-in creates an easy interface allowing to switch between the windows opened on any Microsoft Office 365 application. It creates a tab bar on your standard PowerPoint, Excel or Word window, displaying a tab for each currently open document of the same application. Just like on your Internet browser, you can click on a document's title to switch to it. You can also save all open documents in one click, instead of saving them separately. Office Tabs works on Office 365 and all Office version above 2003, but non on Mac iOS.

Excel add-in - OfficeTabs

Nota Bene: this tool is comparable to the Tab Explorer feature included in the Power-user add-in


30. ParallelDots - Free for limited use


This powerful gives you access to an AI for text analysis. Among the great tools it provide, you can use the AI API for sentiment analysis, keywords generation, text classification (taxonomy), to find abusive content and more. The add-in requires Excel 2010, 2013, 2016 or 2019 (64 bit only) on Windows 7, 8 or 10.  

Excel add-in - ParallelDots

31. vIcons - $99


vIcons is a library of 600 icons that can be inserted in Excel, Word or PowerPoint. Search icons using keywords or just pick them up in the library. vIcons works on Office 2007, 2010 and 2013 for Windows, but the add-in does not run on Mac.


Nota Bene: this is an equivalent to the Icons Library included in the Power-user add-in that contains over 4,000 vector icons.



As the name suggest, this Excel add-in generates numbers randomly. It could be seen as an improvement of the RAND() Excel function, since you can choose the format of the data you want to generate: dates, boolean, integers, real numbers etc. It can also be used to generate strings of characters in order to create random passwords. Random Number Generator works on Windows computers with Excel version 2007, 2010, 2013, 2016 and 2019. It does not work on Mac.

Excel add-in - Random Number Generator


33. Random Sorter - Free


Random Sorter can be really useful if you need sometimes to extract randomly 25% of your population, to make a poll for instance. The add-in will shuffle your data. Random Sorter works on Windows computers with Excel version 2007, 2010, 2013, 2016 or 2019. It does not work on Mac.

Excel add-in - Random Sorter



This small toolbar can be useful for audit, accounting or finance, allowing to add tickmarks to show GL (for General Ledger account), PBC (Prepared By Client), PY (agrees to Prior Year), TB (agrees to Trial Balance), etc. The toolbar works with Excel 96 to 2019 on PC but is not available for Mac.


35. QR4Office - Free


The QR4Office plugin creates QR codes that will allow to open your document with a pre-defined url of your choice. You can use it to make your Excel file or PowerPoint presentations more interactive, so that people can check it with their smartphone or vote for a poll, for instance. QR4Office is available for versions of PowerPoint, Word and Excel later than 2013 on Windows, as well as version 2016 on Mac.

Excel add-in - QR4Office


The Heat Map Excel app lets you display data-based colors on the map of the USA or the World map. You can move your mouse on each state as well to display its name. This app works with Excel 2013 and later on PC, and with version 2016 on Mac.


NB: for a broader choice of 200 map of continents, regions, countries or counties, you can use instead the Power-user add-in and insert one of the many Data maps from this tool. See how it works here in video.

Excel add-in - Geographic Heatmap


37. Formula Foundry - $9-$14/mo


Formula Foundry simplifies formula creation and management in Google Sheets (add-on) and Microsoft Excel Cloud (add-in) with 6 powerful features, including a rich editor, visual builder, and AI assistant for formula generation/debugging, and more. Free trial, no credit card required. Key features include:

  • Rich Editor: Syntax highlighting, auto-completion, bracket matching, smart formatting, bug detection

  • Visual Builder: Point-and-click for IF, QUERY, XLOOKUP, VLOOKUP and nested logic with previews/validation

  • AI Assistant: Generate formulas from plain English, explain formulas or get help debugging

  • Variables: Custom named values (e.g., @@2026_Rev) for use in formulas across tabs, update once see change everywhere

  • Formula Snippets Library: Save/search reusable trusted formulas

  • Excel Sheets Translator: Handles function differences and alerts on limits (Google Sheets Feature)

Excel add-in - Formula Foundry


38. Ultimate Suite - $99


This suite regroups all add-ins from the office-addins website (a company that is independent from Microsoft). Those tools include Password Recovery, the Random Number Generator and Random Sorter, as well as tools to find and remove duplicates, to split columns, to clean data from multiple sources, find broken links or cells similar to your selection, etc. This package is available on Excel versions 2003 to 2010 on Windows but is not available for Mac.

Excel add-in - Ultimate Suite

39. Lucidchart - Subscription required


This app for Excel lets you create flowcharts, UML, wireframes, mockups, org charts and more in your workbook. The app works for Excel 2013 or later on Windows, and for Excel 2016 on Mac.

Excel add-in - Lucidchart


40. Supermetrics - $99/mo


Supermetrics is a great tool for people in digital marketing, looking for a solution to analyze data in Excel. It can connect to a great number of sources like Google Analytics, Google Ads, Social networks and more, allowing you to crunch the numbers for traffic and conversions directly in Excel. You can also use it to create dashboards, refreshing them and emailing them automatically. It is available for Excel 2016 and 365, online and offline.

Excel add-in - Databurst

GIGRAPH creates network diagrams that can be used to visualize relationships between multiple persons or entities. Your data would need to be organized for one-way or two-way relationships, for instance with a 'from' and a 'to' columns. GIGRAPH is available on Windows computers with Excel 2013 Service Pack 1 or later, as well as Excel Online.

Excel add-in - GIGRAPH Network Visualization


42. Selection Diff Tool - €3.99


If you need to compare two strings of text and identify the differences between them, this tool is made for you. This app works on Excel as well as on Word, where it can be of great help if you are reviewing a different version of a document that was not made using Track Change. The app does not work on Mac and is supported by Excel and Word 2013 and later.

Excel add-in - Selection Diff Tool


43. XY Chart Labeler - Free


This plugin lets you take back control of the chart labels in Excel. Working with labels can be very annoying, and you have limited options. So this plugin lets you add labels to data points on your XY chart data series or move XY labels. The XY Chart Labeler actually works not only for XY charts. It is available on Windows and on Mac 2011, but not on Mac with Excel 2016. 


44. Hoadley Finance - $AU176


For people working a lot on Excel in finance, this add-in can be a useful addition. It allows you to perform portfolio analysis, calculate option prices, volatility, value at risk, asset allocation, company valuation, and even more. Formulas can also be used to stream quotes values in real-time from Internet sources. The Hoadley Finance add-ins works with Excel 2003 to 2019, on Windows but not on Mac.


45. ModernCharts - $4.99/mo


This Excel app allows you to reveal what your data contains with a number of charting tools and options. It can be helpful to create infographic charts in Excel or PowerPoint, relying on a comprehensive chart library. The app is available on all versions above 2013, including on Mac. 

Excel add-in - SmartCharts


Connect your Excel spreadsheet to your Microsoft Dynamics data, read it, analyze it or feed your dashboard, and publish data changes back into Microsoft Dynamics. On Word, you can manage templates that will be fed by data from Microsoft Dynamics. If your company is using this CRM, then you will need this app. It is available on Excel and Word 2016 versions and later.

Excel add-in - Microsoft Dynamics

47. Risk Analyzer - $49.95


This add-in lets your perform Monte Carlo risk analysis, histograms and tornado charts, what-if analysis, etc. It does not work on Mac iOS, but is compatible with Excel 2007 and above on Windows.

Excel add-in - Risk Analyzer

48. Panel Chart  - $29.95


When you create Excel line charts with many series, it can easily become impossible to read as lines cross one another or as the size of the legend increases. with the Panel Chart add-in, you can separate lines by categories in different panels, so that you chart is much easier to read and understand. Panel Chart works on Excel 2007 and above on Windows, but is not available on Mac.

Excel add-in - Panel Chart

49. BulkQuotesXL Pro - $74.95


This Excel add-in allows you to download free quotes from multiple data sources directly into spreadsheets. The tool can access data from Yahoo! Finance historical prices and dividends, to Google Finance historical prices, to PiFin historical prices and to CBOE. BulkQuotesXL is available on Windows computer with Excel 2010 and later, but not on Mac.



Vertex42 provides a gallery of over 150 professionally designed templates for Excel and Word. Templates include calendar, planners, budgeting, inventory, invoices or financial statements. The app works on Excel and Word 2013 and later for Windows. 

Excel add-in - Vertex42 Templates Gallery


51. Model Analyzer - €354


This Excel add-in brings multiple solutions for Excel modelling. You can centralize input and output variables in your spreadsheets, but also perform statistical analysis, such as what-if analysis (with tornado charts, spider charts and sensitivity tables), scenario analysis, multiple goal seek, break-even analysis or Monte-Carlo simulations. Model Analyzer is made for financial analysts, economists and researchers. It is only available on the 32 bit version of Excel 2007 and 2010. It is not compatible with Mac either.

Excel add-in - Model Analyzer


This small add-in for Office lets you get weather and climate records and forecasts directly into Excel. The data is available down to the hour. It also includes geocoding allowing to get the weather for a specific address.


53. Spreadsheet123 - Free


Before starting to build spreadsheets from scratch, you might sometimes want to pick up a nice template and work on it. That's exactly what you can do with Spreadsheet123, a library of templates with financial statements, budgeting, payroll, invoicing, time sheets, checklists or inventory management templates. Spreadsheet123 works with Excel and Word 2013 Service Pack 1 or later as well as Excel and Word online, but is not available on Mac.

Excel add-in - Spreadsheet123


This Jensen add-in is made to identify optimized portfolios. Define a potential portfolio by providing its initial investment, annual return, salvage value and life. The model will use the standard deviation to estimate risk and will identify the optimized portfolio.


55. Inventory - Free


This Jensen add-in computes inventories, with the possibility to integrate backorders, lost sales, finite or infinite replenishment rates. The model identifies the optimum lot size with cost breaks. 


56. Bubbles - Free


This app lets you create nice and colorful bubble charts, to display 3 or 4 dimensions of information. Use the horizontal and vertical axes, bubble size and colors to display complex information in a simple way. Bubbles works on Excel 2013 and later on Windows, as well as Excel 2016 for Mac.

Excel add-in - Bubbles



Excellent Analytics is the must-have add-in to dig into your Google Analytics data directly from Excel. Use it to crunch your Analytics data and identify how you can bring more traffic to your website.


58. SEOTools - €79


This add-in lets you integrate data from Google Analytics, Google Adwords, the Google Search Console, SEMrush, Youtube, Ahrefs, Moz and other platforms directly into Excel so you can work your SEO data and identify key trends on your website.


59. SEOGadget - Free


SEOGadget lets you analyze your analytics data into Excel. It can access data from Majestic SEO, Moz and Grepwords and bring it to Excel for you to work on it and identify how you can boost your website's ranking. The tool works on Windows with Excel versions 2010 and above, but does not work on Mac iOS.



This add-in can help you manage your personal finance, letting you do you checkbooks and bank statements with Excel. You can move rows up or down in a single click, so you can align your Excel records with your bank statements. The tool detects and highlights the first unprocessed row. The Checkbook Assistant works with Excel 2007 and later on Windows, but is not available for Mac.

Excel add-in - Checkbook Assistant

61. Loan Assistant - $19.95


This plugin lets you easily compute loans, playing with the annual flat interest rate, load amount and balloon payment at the end of the load to calculate the actual payment per period and total interests to pay. The plugin can also create a load detail year by year with the due capital and interest payments, as well as the remaining capital. The Loan Assistant works with Excel 2007 and later on Windows, but is not available for Mac.

Excel add-in - Loan Assistant


Turn Excel into a Q&A software with this simple plugin. Define a list of questions and their answers, choose the order or make it random and run it to get questions asked like flash cards and make it a game in a private or professional situation. The plugin is free and works with Excel 2007 and later. It is not supported on Mac.

Excel add-in - Flash Card Assistant


63. ActiveData - $249


ActiveData adds data analytics and time-saving worksheet and workbook management features into Excel. Features include join, merge, query, summarize, find duplicates, split data, etc. The tool works with Excel versions 2007 and later on Windows, but is not available for Mac.


64. Mekko Chart Creator - $29.95


Create Marimekko charts with this tool, so you can display 3 dimensions of data in an appealing way. This plugin works with Excel 2007 and later on Windows only.

Excel add-in - Mekko Chart Creator

Nota Bene: for more advanced Mekkos that are editable, you can use instead the Mekko feature of the Power-user add-in for PowerPoint, Excel and Word. 



This small add-in simplifies the process of deleting rows selectively, based for instance on the value in a specific column.



For Mac users, this add-in is one of the best available options. Created by Ron de Bruin, it contains a collection of utility tools that can be relevant time-savers in several situations. 



When working with dates in Excel, it can be a pain - and a possible source of errors - to type manually multiple dates. With this app you can now just pick a date in a calendar and it will be automatically formatted as date. The app works with Excel 2013 or later on Windows, on Excel 2016 on Mac and on Excel Online. Note that a similar functionality exists as part of the larger Power-user add-in.

Excel add-in - XLTools Calendar


Use this add-in to bookmark your favorite workbooks, sheets or range, so you can find and open them anytime from other Excel spreadsheets. The tools is available on Windows only, for Excel versions 2007 and later.

Excel add-in - Favorite Bookmarks


This add-in from Microsoft helps you translate functions and formulas between languages supported by Excel. It works with Excel 2013 and later on Windows, Mac and Excel Online.

Excel add-in - BrushTools


70. RDBmail - Free


This mail add-in for Excel from Ron de Bruin lets you automate the process of sending sheets, data or workbook. When you have a workbook open, you can just click on the buttons on the ribbon to send it in an Outlook email, with options to send the entire workbook, just the active worksheet, or to send is with values instead of formulas. RDBmail works with Excel 2007 to 2019 on Windows.

Excel add-in - RDBmail

71. Intrinio - Free


Intrinio lets you screen all equities in the United States, using filters on 500 parameters to identify the equities that meet your requirements, such as current stock price, return on equity, dividend yield, price to earnings ratio, sector, employee count, etc. Intrinio only works on Windows with Excel 2013 or later.

Excel add-in - Intrinio


This app helps you learn some Excel with a list of formulas to learn, for beginners, intermediates or Excel experts, Q&A on formulas and other information you need to know if you are to use Excel frequently. The app works with Excel 2013 and later on Windows as well as with Excel 2016 for Mac.

Excel add-in - Excel training and tips

73. Power Reconcile - Free but $9.99/mo subscription required


This add-on is very relevant for people in finance who need to reconcile reports between vendor and accounts payable. The report will be created automatically, highlighting perfect matches or partial matches, saving you potentially a lot of time compared to a manual reconciliation. It is compatible with Excel 2013 and later on PC or Mac as well as the web version.



This add-in by Microsoft helps you create workflows between different applications like Excel, Outlook, Planner, Twitter, Trello, MailChimp and others. These workflows can include approval process, mobile push notifications, email sending etc. It is compatible with Excel 2013 and later on PC, Mac or the web.

Excel add-in - Microsoft Flow


75. Accelerate Excel - Subscription required


Accelerate Excel is a powerful Excel add-in designed to boost productivity for anyone who spends a lot of time in Excel. Whether you're a financial analyst, accountant, or M&A advisor, the toolbar offers a practical set of features to simplify repetitive and complex tasks:

  • Convert PivotTable: Instantly turn PivotTables and PowerPivots into fully formatted standard cells while preserving hierarchies. This is ideal for those who start with PivotTables for data analysis but need the flexibility of standard cells for customized reporting.

  • Explore Formula: Visually explore the components of a cell's formula in a tree view and navigate through its references to other cells, making complex formulas easier to understand.

  • Copy & Paste: A versatile task pane that simplifies copy-paste tasks, offering advanced options for repetitive pasting, duplicating tables, and pasting non-contiguous selections.

Accelerate Excel is compatible with the desktop version of Excel on Windows. The premium version includes over 100 tools, while a free version is also available with essential tools like Formula Explorer to help you get started.





Conclusion:

Excel is among the most used software in the world, and a key tool for business in most companies. However immensely rich and complex, the standard version of Excel is still just a fraction of what can be done on it by using the variety of add-ins that have been created around it.

If you are interested in Microsoft 365 PowerPoint add-ins as well, check our list of 40+ add-ins, plugins and apps for Microsoft PowerPoint.

If you are interested in Microsoft 365 Word add-ins as well, check our list of 60+ add-ins, plugins and apps for Microsoft Word.

 
 
bottom of page